Wednesday, October 12, 2011

Construction Stop Motion

Construction Stop Motion Video Clips.





There digging to keep the water run-off from pouring into a near by city. The trench is 50 feet wide and will stretch 4.5 miles. The piping is an 18' concrete precast piping. Every mile there is a 19' water main that connects to the main city line to a watershed that will filter the water to the near by atlantic ocean. For maitanice there is a 40" valve chamber that connects to a 120" manhole. Since there are no lines in the city they will also need to run pipe in the city. For this they will use 20 4'x4' catch basins that will run one block for 10 miles. Connecting to the catch basins will be a 3' iron steel pipe that will connect to a 3' diameter main which is on a 10' pipe stretch the 10 miles until it will reach 12' piping for 4 miles. At every main will be a 12" blowoff valve chamber. For the 4 miles there will be 12' piping. Every mile will need 2 2'x4' catch basin on each side of the road. Connecting the basins to the 12' main line will be a 3' iron steel piping. Once it reaches the watershed there will be a 180 degree turn that the piping will split into 4 pieces. At the main line there will be a 4 splice section that will carry 8 feet of 3' piping. At the end of the 3' piping will be a 3' culvert to each pipe. We are using dirt Project cost: 86 million.

Tags: Construction, Stop, Motion, excavators, excavator, cranes, trucks, cars, diesel, gas

delsy luggage Insulated Tumbler With Handle

No comments:

Post a Comment